Project description

Assignation

Was formed for placing industrial enterprises of different sectoral activity.

CHARACTERISTICS OF THE GROUND AREA

Situated in the North-West of Kaluga Region in the Borovsk district, on the border of Kaluga and Moscow regions.

Total industrial park area is - 972 ha,

including:

Northern site- 127 ha

Eastern site- 467 ha

Central site- 339 ha

Western ground - 39 ha

Assigned - 577 ha

Disposable for production placement - 395 ha*


*Offered land plots are in property of "Industrial Park "Vorsino" (LLC)

 

Project participants

The productions of KT&G Rus (LLC) (tobacco goods production), Samsung Electronics Rus Kaluga (LLC) (TV panels assembly), Nestle Russia (LLC) (production of pet-food)

Investment projects realization of the following companies on the territory of the park is begun:

  •  ÊÍÏÝÌÇ (CJSC) - electrometallurgical plant,
  • Odysseyprom (LLC) - production of furniture,
  • Eurofloat Kaluga (CJSC) - production of plane glass,
  • Omega Liz Kaluga (LLC) - logistic center,
  • Vintraskom (LLC) - production of plastic tableware for airlines,
  • Onvest Kaluga (LLC) - logistic center,
  • Sormat Rus (LLC) - production of hardware,
  • Tuplex (LLC) - production of parquet underlayer,
  • YOUKONN (LLC) - production of polyester staple fiber,
  • John Deere Rus (LLC) - agricultural machinery production,
  • Triada-Impex (CJSC) - construction materials production,

CHARECTERISTICS OF THE PROJECT

Total investments volume is more than 2,25 billion euro

Total amount of jobs - about 10000 people

INFRASTRUCTURE

GAS SUPPLY

The industrial park gasification is finished.

POWER SUPPLY

Substation for  investors’ power supply is put into operation. Distributing power station for is put into operation on the Eastern site. The contracts on technological joining of Northern and Eastern sites consumers are concluded.

WATER SUPPLY AND DRAINAGE SYSTEM

Works on building industrial park’s water supply point and local treatment facilities are being carried out. Phased putting individual units into operation, taking into account the outlet on the estimated capacity (4000 cubic meters per day) is planned to be finished by 2011.

COMMUNICATION

Agreements on cooperation with leading operator Centertelecom (OJSC), Kaluga Region affiliated branch are concluded.

ROADS
Asphalt-covered roads were constructed on the Eastern site.

 

PHOTOS OF THE INDUSTRIAL PARK "VORSINO"

 

Placement Application Placement Application

Investment Newsletter Investment Newsletter

#7 (11)

Investment Angel 2010 Investment Angel 2010

World Investment Award

Anticrisis offer Anticrisis offer

for the production placement